4/14/05 Kitchen and Bathroom pictures taken during inspection period of house.
4/27/2005 Purchased House and work to begin on sat.  We need to complete work ASAP since Amy's due date is May 27.
4/30/2005

 

First day of work!  Joe ripped out the kitchen and Amy started building the kitchen cabinets. 
All the old cabinets we cut up and loaded into our two trucks and taken to the dump.  Long day of work.

5/1/2005 Continued putting together the cabinets and started installing cabinets and hooked up dish washer.
5/3/2005 Pool work gets started and with the pool being drained you can see how bad the plaster really was.

Bathroom work gets started as the bathroom cabinet gets removed, new cabinet get put together and installed.  The mirror had to be removed from current location which was too low, the top cabinet drawer was too deep and hit the supply line so the drawer had to be shortened, and there were a couple of extra trips to Home Depot as the drain pipes were too short for the new sink.
5/8/2005 Work in kitchen and bathrooms is moving along but not as fast as we had hoped.  First picture shows the nearly completed bathroom from the 5/3 work pictures above.  The next two pictures are of the master bedroom going from the old to the new.  The final two pictures are of the progress in the kitchen.
 
5/14/2005

5/15/2005

More progress in kitchen and bathrooms.  The first two pictures are of the master bathroom with the new medicine cabinet and the new vinyl installed.  The next tow pictures show the progress on the kitchen.  This doesn't look like the same house.
5/26/2005

5/27/2005

Finished up on the kitchen.  Installed the countertops, sink, disposal, range hood, and completed the work on the kitchen window sill.  This weekend was our target weekend to have all work complete.
 
  The next two weeks were spent landscaping, working on the pool, and getting the air conditioning fixed.  Basically a big hassle. 
6/7/2005 House is complete and goes on the market tomorrow.  We are finally done!  See how crystal clear the pool is!
Summary Kitchen.  Removed all cabinets, range hood, and oven.  Replaced with all new cabinets, new sink, new disposal, supply lines, range, and new range hood.  Replaced 2 broken kitchen windows, installed 220 outlet, and built window sill.
Bathroom.  Removed old cabinet and sink and replaced with new bathroom cabinet, new sinks, supply lines, flooring, tub drain, and shower head.  Caulked and painted around tub, moved bathroom mirror to new position, and replaced light fixture, toilet and towel bars.
Master Bathroom.   Removed old cabinet and sink and replaced bathroom cabinet, new sinks, supply lines, flooring, tub drains, shower head, caulked and painted around tub.  Removed old shower door frame and cleaned and painted entire shower.  Removed old medicine cabinet and opened wall and installed new modern medicine cabinet.  Replaced light fixture, toilet and towel bars.
Pool.  Re-plastered entire pool, replaced skimmer assembly, installed new light, new pump, new pool vac system, new manual skimmer, pool brush, chlorine float, and added all necessary chemicals.  Spent 2 weeks cleaning pool.
Carpet. New carpet through the house including one bedroom that was not carpeted.
Air Conditioning.
Replaced compressor and recharged system.  Blows nice and cold now!
Bedroom. 
Installed and painted new closet doors.
Water heater.
  Removed old line and put in new line to codes.
Landscaping.  Added a couple plants and did a lot of cleanup work.  Especially around the pool.  Trimmed tree including branches that were on the roof tiles.
Shed.  Fixed doors and lock assembly and removed all leftover items.
Misc.  Painting and cleanup.  Cut and replaced 2 mirror tiles in entry way.